Humbly Grove Energy Limited – REMIT Compliance

Humbly Grove Energy Limited (HGEL) publishes the planned (maintenance) and unplanned outages with respect to Humbly Grove gas storage facility in accordance with the requirements of EU Regulation (No. 1227/2011) on wholesale energy market integrity and transparency (REMIT).

Publication according to Article 4 (1) of REMIT/UMM (Urgent Market Message).

Whilst every effort is made to ensure that the information is given in good faith and to best of HGEL knowledge and belief at the time of posting, no warranty is given as to the accuracy or completeness of the information.

Remit

Main summary of outage: summarises the main content of the publication, plus note if applicable, a history of prior publications regarding the same event, e.g. if a prognosis is updated or an unplanned outage becomes a planned outage.

Notification of Planned Maintenance

Start date of planned outage Start time of planned outage End date of planned outage End time of planned outage Impact planned outage
14th Nov 2024 07:00 14th Nov 2024 19:00 Planned Maintenance Activities – Pigging Operations. Injection and Withdrawal reduced to 0 GWh over period
9th May 2024 05:00 25th May 2024 05:00 Annual Shutdown Maintenance & Inspection Injection & Withdrawal reduced to reduced to 0 Gwh over period
4th Sep 2023 05:00 14th Sep 2023 05:00 Annual Shutdown Maintenance & Inspection Injection & Withdrawal reduced to reduced to 0 Gwh over period
17th Nov 2022 07:00 17th Nov 2022 19:00 Planned Maintenance Activities – Pigging Operations. Injection and Withdrawal reduced to 0 GWh over period
1st Oct 2022 05:00 10th Oct 2022 05:00 Planned Maintenance Activities – Planned maintenance on Export System. Withdrawal reduced to 0 GWh – Injection remains available
14th May 2022 05:00 30th May 2022 05:00 Annual Shutdown Maintenance & Inspection Injection & Withdrawal reduced to reduced to 0 Gwh over period
2nd Apr 2022 07:00 2nd Apr 2022 19:00 Planned Maintenance Activities – Compressor Maintenance Injection & Withdrawal reduced to 0 Gwh over period
18th Nov 2021 07:00 18th Nov 2021 19:00 Planned Maintenance Activities – Pigging Operations Injection & Withdrawal reduced to 0 Gwh over period
6th Nov 2021 05:00 16th Nov 2021 05:00 Annual Shutdown Maintenance & Inspection Injection & Withdrawal reduced to reduced to 0 Gwh over period
6th Jul 2021 07:00 8th Jul 2021 07:00 Planned Maintenance Activities – Pigging Operations. Reduced Withdrawal capability to 25Gwh – Injection remains available
16th Jun 2021 05:00 23rd Jun 2021 17:00 Planned Maintenance Activities – Pipeline Maintenance. Reduced Withdrawal and Injection capability to 0Gwh
12th Feb 2021 07:00 12th Feb 2021 19:00 Planned Maintenance Activities – Pipeline Maintenance Injection & Withdrawal reduced to 0 Gwh over period
4th Oct 2020 05:00 12th Oct 2020 05:00 Planned Maintenance Activities – Planned Maintenance on Export System Withdrawal reduced to 0 Gwh – Injection remains available
17th Dec 2020 07:00 17th Dec 2020 19:00 Planned Maintenance Activities – Pigging Operations Injection & Withdrawal reduced to 0 Gwh over period
9th Nov 2020 05:00 22nd Nov 2020 05:00 Gas Compressor Maintenance Injection & Withdrawal reduced to 39 Gwh over period
17th Aug 2020 05:00 30th Aug 2020 05:00 Annual Shutdown Maintenance & Inspection Injection & Withdrawal reduced to 0 Gwh over this period
18th Dec 2019 07:00 18th Dec 2019 19:00 Planned Maintenance Activities – Pigging Operations Injection & Withdrawal reduced to 0 Gwh over period
4th Dec 2019 07:00 17th Dec 2019 04:59 Gas Compressor Maintenance Injection & Withdrawal reduced to 49 Gwh over period
9th May 2019 05:00 23th May 2019 04:59 Annual Shutdown Maintenance & Inspection Injection & Withdrawal reduced to 0 Gwh over this period
9th Jan 2019 09:00 9th Jan 2019 21:00 Planned maintenance activity – Essential works to separation system Injection & Withdrawal reduced to 0 Gwh over this period
14th Nov 2018 07:00 14th Nov 2018 19:00 Planned maintenance activity – Pigging operations Injection & Withdrawal reduced to 0 Gwh over this period
6th Nov 2018 07:00 6th Nov 2018 19:00 Planned maintenance activity – Pigging operations Injection & Withdrawal reduced to 0 Gwh over this period
23rd July 2018 09:00 24th July 2018 20:00 Planned maintenance activity – Pigging operations Withdrawal reduced to 0 Gwh over this period.  Injection remains unaffected
21st July 2018 07:00 22nd July 2018 19:00 Planned maintenance activity – Pigging operations Withdrawal reduced to 0 Gwh over this period.  Injection remains unaffected
16th June 2018 05:00 25th June 2018 04:59 Planned maintenance activity Withdrawal reduced to 0 Gwh over this period.  Injection remains unaffected
16th May 2018 05:00 26th May 2018 04:59 Planned maintenance activity Injection & Withdrawal reduced to 0 Gwh over this period
31st Mar 2018 06:30 31st Mar 2018 18:30 Planned maintenance activity – Incoming Power Supply Injection & Withdrawal reduced to 0 Gwh over this period
4th Jan 2018 07:00 4th Jan 2018 19:00 Planned maintenance activity Injection & Withdrawal reduced to 0 Gwh over this period
2nd May 2017 05:00 1st June 2017 04:59 Annual Maintenance- Injection & withdrawal reduced to 0 Gwh over this period
24th May 2016 05:00 25th May 2016 04:59 Facility throughput reduced to 0 Gwh for both import & export during this period.
6th May 2016 06:00 23rd May 2016 05:50 Annual shutdown – Maintenance & Inspection.  Injection and withdrawal reduced to 0 Gwh.
11th November 2015 08:00 11th November 2015 20:00 Planned maintenance activityInjection & Withdrawal reduced to 0 Gwh over this period
6th August 2015 22:26 Planned maintenance completed ahead of schedule Full capacity reinstated
20th July 2015 06:00 7th August 2015 05.59 Annual Shutdown Maintenance & Inspection Injection & Withdrawal reduced to 0 Gwh over this period
18th February 2015 14:00 Planned maintenance completed ahead of schedule.  Full capacity reinstated
18th February 2015 08:00 18th February 2015 20:00 Gas import & export capacity reduced to zero
28th August 2014 08:00 28th August 2014 15:00 Export capacity zero due to essential maintenance
4th August 2014 06:00 22nd August 2014 05:59 Annual shutdown maintenance & inspection. Injection & Withdrawal reduced to 0 Gwh over this period
20th August 2013 22:30 Humbly Grove full capacity reinstated
3rd August 2013 06:00 21st August 2013 05:59 Gas movement capacity zero
26th May 2013 31st May 2013 05:59 Continuation of above for extended period –  Maximum daily throughput reduced to 3MCM injection and 3MCM withdrawal
22nd May 2013 06:00 27th May 2013 05:59 Revised dates to replace previous notice – Maximum daily throughput reduced to 3MCM injection and 3MCM withdrawal
18th May 2013 06:00 22nd May 2013 05:59 Maximum daily throughput reduced to 3MCM injection and 3MCM withdrawal
3rd May 2013 16:58 Restriction on daily throughput removed.  Humbly Grove full capacity reinstated.
25th April 2013 6th May 2013 05:59 Continuation of above – maximum daily throughput reduced to 3MCM injection and 3MCM withdrawal
17th April 2013 06:00 28th April 2013 05:59 Maximum daily throughput reduced to 3MCM injection and 1 MCM withdrawal
16th September 2012 30th September 2012 Gas movement capacity zero due to planned maintenance period
6th June 2012 10th June 2012 Gas movement capacity zero due to planned maintenance period
18th March 2012 19th March 2012 Gas movement capacity zero due to well workover operations
17th March 2012 17th March 2012 Maximum Injection throughput reduced to 4.8 MCM due to well workover operations
8th March 2012 16th March 2012 Gas movement capacity zero due to well workover operations

Notification of Unplanned Outage

Time and Date of unplanned outage Estimated duration of outage (hours) Loss of volume (mcm/d) Return to Operation Comment
14th May 2022 05:00 29 Days 7 28th Jun 2022 1900 Withdrawal capacity reduced to 0, due to export equipment failure.
20th Apr 2022 16:50 23 hours 7 21st Apr 2022 1600 Injection and withdrawal capacity reduced to 0, due to control system issue.
2nd Feb 2019 05:00 36 hours 7 3rd Feb 2019 1700 Injection and withdrawal capacity reduced to 0, due to severe weather conditions.
23 Jan 2018 04:00 5 hours 7 23 Jan 2018 09:00 Injection and withdrawal capacity reduced to 0, due to loss of mains power supply
12 Dec 2017 10:25 2 hours 7 13 Dec 2017 Withdrawal capacity reduced to 0 mcm/d due to loss of mains power supply
15 Oct 2017 02:20 58 hours 3.5 17 Oct 2017 Injection and withdrawal capacity reduced, due to imposed compressor limitations.
12 Sept 2017 04:30 12 hours 7 12 Sept 2017 Injection and withdrawal capacity reduced to 0% due to loss of mains power.
11 Sept 2017 11:00 2 hours 7 11 Sept 2017 Injection and withdrawal capacity reduced to 0% due to loss of mains power supply.
16 January 2017 05:00 10 hours 7 16 January 2017 0% availability for Export gas nominations due to export facility issues.  Injection nominations remain unaffected.
19 July 2015 09:53 24 hours 10 July 2015 21:57 Injection and withdrawal capacity reduced to 0% due to electrical fault.  Annual shutdown for maintenance will continue as planned tomorrow.
14 Sep 2014 06:00 24 hours 15 Sep 2014 07:00 0% availability for exports
05 Jan 2014 03:06 06 Jan 2014 12:08 0% availability for exports
24 Aug 2013 11:34 25 Aug 2013 01:12 0% availability for exports
08 April 2013 14:39 4 hours 09 April 2013 08:40
18th November 2012 48 hours 20th November 2012 0% availability for gas nominations due to incoming power failure
1st October 2012 48 hours 3rd October 2012 0% availability for gas nominations due to incoming power failure